Emery Creek Storm Water Quality Control Pond

Construction – Toronto, ON

The Objective

Emery Creek is widely acknowledged as one of the largest pollution contributors to Humber River. Our task was to build a pond and stormwater treatment facility for Emery Creek at the mouth of the river, in order to improve the water quality of the river in its entirety.

Challenges

This project required the excavation of a very large area and the installation included clay liners and geomembranes throughout the site. In performing these tasks we had to cross six major oil pipelines, which required us to uncover and shore each pipeline.

The Result

We engineered and constructed three stormwater retention ponds which have slowed runoff and allowed for pollution to settle before entering the Humber River, greatly improving the overall water quality.

Location

Toronto, ON

Owner

City of Toronto

Completion Date

2017

Work Performed As

General Contractor

Final Value

$13,243,156.31